Wind farm designers and consultants

Our consultants develop 3D Revit projects of wind power stations.

Wind farms projects includes several stages:

  • The choice of terrain. In order for the wind farm to work as efficiently as possible, the most important is the selection of areas with optimal conditions. The wind power plant should be located at a sufficient distance from the settlements, but it should be possible to connect to the power grid of consumers.
  • Wind speed is the most important indicator when choosing a site for a wind farm. For the most accurate results, wind speeds are measured in parallel at several points over a period of time. After that, the average value is derived, which allows you to determine how this area is suitable for the construction of a wind power plant.
  • Selection of wind power equipment.
  • Selection of the optimal connection with consumers' power grids.

For efficient operation of a wind power plant, it is necessary to be able to transfer the generated electricity to the electrical grids of the consumer.

Due to the compactness and mobility of such power plants, it is possible to build a wind power plant at an optimal distance from country houses, small enterprises, farms, etc.

Our consultants are ready to design a project of wind power plant, the most adapted to the specific conditions of your Company.